MYTH: "A roadmap is a plan."

The correction: a roadmap is a list of intentions until each item has an owner, a trigger, and a definition-of-done. Boxes on a timeline don't execute themselves.

SOP: Turning a roadmap item into work
Run this whenever a roadmap box is supposed to start.

Stage 1 — Assign
— ☐ Name the single Accountable owner for the item. (Owner: planner)
— ☐ Write the trigger that says it's time to start. (Owner: planner)

Stage 2 — Define done
— ☐ Write the binary done-criteria; "shipped" is not a criterion. (Owner: item owner)
— ☐ List the first 3 concrete steps. (Owner: item owner)

Stage 3 — Track
— ☐ Put the item where work actually lives, not just the roadmap slide. (Owner: item owner)

Owner: planner then item owner. Trigger: a roadmap box comes due. Done-when: the box has an owner, a trigger, and binary done-criteria.

Save this. Run it every time.
This post was published in the Telegram channel The Ops Playbook. Subscribe here: @TheOpsPlaybook.
growth

Latest posts in “Growth and funnels”

All channels in this category →

start

Готовы запустить рекламу через сеть public.tg?

Новый оффер, продукт, GEO, кейс, событие или партнёрский запуск — соберём маршрут под задачу и отдадим медиаплан.

Telegram для медиаплана: @AFFtop_connect. Быстрый тест: $20 за канал, $1000 за пакет по сети.