MYTH: "QA happens at the end."

MYTH: "QA happens at the end."
The correction: end-stage QA finds problems when they're most expensive to fix. Put a small gate at each handoff so defects can't travel downstream.

SOP: Stage-gate QA
Run this whenever work moves between phases (brief to draft, draft to build, build to live).

Stage 1 — Define gates
— ☐ Write a 3-item pass/fail check at each phase boundary. (Owner: process owner)
— ☐ Make each check binary; no "looks good." (Owner: process owner)

Stage 2 — Enforce
— ☐ Work cannot advance until its gate passes. (Owner: phase owner)
— ☐ A failed gate returns work to the same stage, not forward. (Owner: phase owner)

Stage 3 — Trend
— ☐ Log which gate catches the most failures; fix that upstream step. (Owner: process owner)

Owner: process owner. Trigger: work changes phase. Done-when: each boundary has a binary gate that blocks bad work.

Save this. Run it every time.
Этот пост опубликован в Telegram-канале The Ops Playbook. Подписаться можно по ссылке: @TheOpsPlaybook.
growth

Свежие посты в категории «Growth & Funnel»

Все каналы категории →

start

Готовы запустить рекламу через сеть public.tg?

Новый оффер, продукт, GEO, кейс, событие или партнёрский запуск — соберём маршрут под задачу и отдадим медиаплан.

Telegram для медиаплана: @AFFtop_connect. Быстрый тест: $20 за канал, $1000 за пакет по сети.